Domo DO911WK Mode D'emploi page 37

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 18
www.domo-elektro.be
PARTS
1. Hinge
2. Lighting on/off
3. Temperature control
4. Display temperature
5. 7 wooden racks
6. Support feet
7. Door with rubber seal and glass window
8. Handle
A: upper zone
B: lower zone
2
INSTALLATION
1. Remove all packaging materials and any promotional stickers.
2. Before connecting the appliance to the power net, leave it standing upright for
about 2 hours. This reduces the risk of any malfunctioning of the cooling system
due to transportation.
3. Clean the inside of the wine-chiller with lukewarm water and a soft cloth.
4. Place the appliance on a firm, steady surface, that is strong enough to carry a filled
wine-chiller. To level the appliance, you can adjust the front support feet at the
bottom of the appliance.
5. Do not place the appliance directly into sunlight or near heat sources. Direct
sunlight could affect the coating of the appliance and the proximity of heat
sources may cause an increase of the energy consumption. Extreme temperatures
may also cause malfunctioning of the appliance.
6. Make sure that the air can circulate around the appliance. Therefore, leave a free
space of at least 10 cm between the appliance and any other object.
7. Screw the handle onto the door with the supplied screws.
8. Only suited for indoor use. Do not use the appliance in basements or garages.
9. The cord should not be exposed or left hanging loose to prevent possible
accidents.
3
A
7
5
8
B
4
37
DO911WK
1
6

Publicité

Table des Matières
loading

Table des Matières