Télécharger Imprimer la page

A&E Bath and Shower Madou-60-BLK Guide D'installation page 8

Publicité

BASE
INSTALLATION
1- Start by placing the base (item 03)
inside the provided structure. Make
sure the base is level by using a
leveling tool to check its position.
2- Use a pencil to trace the outline of
the base and the circumference of the
drain hole on the floor.
3- Using a countersink bit slightly
smaller in diameter than the screws,
drill holes through the edge of the
base into the wood of the provided
structure. These holes will be used
later to secure the base in place.
Make sure that there is a stud
aligned with the edge of the base. If
there is not, install one.
8
INSTALLATION
DE LA BASE
1
1- Commencez par placer la base
(article 03) à l'intérieur de la structure
fournie. Assurez-vous que la base est
de niveau en utilisant un niveau à bulle
pour vérifier sa position.
2- Tracez avec un crayon le contour
de la base ainsi que la circonférence
du trou de drainage sur le sol.
3- À l'aide d'une mèche à fraisurer
légèrement plus petite en diamètre
que les vis, percez des trous à travers
le bord de la base dans le bois de la
structure fournie. Ces trous seront
utilisés plus tard pour fixer la base en
place.
INSTALACIÓN
DE LA BASE
1- Comience colocando la base (artícu-
lo 03) dentro de la estructura proporcio-
nada. Asegúrese de que la base esté
nivelada utilizando una herramienta de
nivelación para verificar su posición.
2- Trace con un lápiz el contorno de la
base y la circunferencia del agujero de
drenaje en el suelo.
3- Utilizando una broca avellanadora
ligeramente más pequeña en diámetro
que los tornillos, taladre agujeros a
través del borde de la base en la
madera de la estructura proporcionada.
Estos agujeros se utilizarán más adelan-
te para fijar la base en su lugar.
Assurez-vous qu'il y ait un montant
de bois aligné avec le seuil de la
base. Si non, veuillez en poser un.

Publicité

loading

Ce manuel est également adapté pour:

Sd8-60-blkSd8-60-chr