dirna Bergstrom Bycool Green Série Instructions De Montage page 19

Masquer les pouces Voir aussi pour Bycool Green Série:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

DINAMIC 1.1
PRIOR OPERATIONS:
• Disconnect the battery.
• Remove inner air distribution panel from evaporator
unit.
CABIN INTERIOR:
1
Introduce the template supplied and mark
bores.
A- If there are 2 beds, place the template
between the two.
B- If there is 1 bed, place the template on the
bed.
Make through bore Ø4 with long broach
2
in bore position Ø48, and then make the
following bores.
A- make (1) Ø35 in the cover only
B- make (1) Ø19 in the cover only
C- make (1) Ø48 in the cover only
D- make (4) Ø22 in the cover only
Air conditioning for vehicles
ARRIBA
1
ARRIBA
2D
19
EN
ARRIBA
Ø48
Ø35
Ø19
ARRIBA
Ø48
2
Ø35
Ø19
2C
2D
2A
3
2B

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dinamic 1.1 12v

Table des Matières