Télécharger Imprimer la page

LG DLE0442W Guide Du Propriétaire page 10

Publicité

Part 3
INITIAL STEPS FOR INSTALLING YOUR DRYER
STEP 3 Connecting the Exhaust
and Venting System.
WARNING!
!
• Use a heavy metal vent.
• Do not use a plastic vent.
• Do not use a metal foil vent.
• Failure to follow these instructions can
result in death or fire.
• Clean old ducts before installing this dryer
Note
Vent end will face to the outside home and
improper taping and unstable installation of vent
will cause undesirable drying performance.
In addition to the following warnings, please refer
to manual section on Exhaust Requirements and
Maintenance. IMPORTANT: To reduce the risk of
fire, combustion, and gas accumulation, the dryer
must be vented to the outdoors. Please follow the
instructions (and all others in this manual) very
carefully.
• Do not use thin plastic or foil ducting.
• Rigid or semi-rigid metal ducting is recommended
for use as transition ducting between the dryer and
and the wall. In special installations when it is
impossible to make a connection with the above
recommendations, then a UL-listed flexible metal
transition duct may be used between the dryer and
wall connection only. The use of this ducting will
affect dry time.
• Position the Dryer such that the exhaust duct run is
as short as possible.
• Clean old ducts before installing this dryer
• The male end of each section of exhaust duct must
point away from the dryer
• Use as few elbow joints as possible.
• Use duct tape on all duct joints
• Insulate ductwork that runs through unheated
areas in order to reduce condensation and lint
build-up on pipe walls; and
• PLEASE BE AWARE THAT FAILURE TO
EXHAUST THE DRYER CORRECTLY WILL
VOID THE DRYER'S WARRANTY.
All manuals and user guides at all-guides.com
ALTERNATE EXHAUST DIRECTIONS
1.
Remove a screw and exhaust duct.
2-1.
Detach and remove the knockout that
matches the desired venting direction
(Right side not available on Gas Dryers)
① ① , ② ② , ③ ③ the order of work.
2-2.
Reconnect the duct to the blower
housing and attach the duct to the
base.(Duct is a SVC part)
3-1.
Pre-assemble 4" elbow with 4" duct.
Wrap duct tape around joint.
3-2.
Insert elbow duct assembly first through the
side opening and connect the elbow to the
internal duct.
9

Publicité

loading