max. 11 lb / 5 kg
1
1 Start heating with the ash drawer open
2 Close the ash drawer no later than 15 minutes after igniting.
3 When the fi rst batch is burnt, add fi rewood (max. 5 lb / 2.2 kg).
4 If you need more heat, add fi rewood after the previous batch
has burnt (max. 4 lb / 1.8 kg).
Figure 16. Starting HIVE Flow heating and adding the batch of fi rewood.
max. 8 lb / 3.8 kg
1
1 Start heating with the ash drawer open
2 Close the ash drawer no later than 15 minutes after igniting.
3 When the fi rst batch is burnt, add fi rewood (max. 4 lb / 1.8 kg).
4 If you need more heat, add fi rewood after the previous batch
has burnt (max. 3 lb / 1.4 kg).
Figure 17. Starting HIVE Flow Mini heating and adding the batch of fi rewood.
15 min
2
15 min
2
max. 5 lb / 2.2 kg
60 min
3
/₈"(3mm). Ignite the fi rewood on top.
1
max. 4 lb / 1.8 kg
50 min
3
/₈ " (
3mm). Ignite the fi rewood on top.
1
max. 4 lb / 1.8 kg
35 min
4
max. 3 lb / 1.4 kg
35 min
4
19