4. Important Tips
The solar PV system is grid-tied. Please check if it is allowed in your
√
area. Depending on the region,of ficial approval may be required
√
√
√
before or after installation.
√
Hub 2000 and AB1000 should be protected from direct sunlight to
prevent rapid temperature increase.
Please check the accessories before installation, some accessories
€
need to be purchased separately.
After the installation, please first download the Zendure App to check
electricity produced and set the power to the Microinverter.
After SolarFlow installation, it will take about 5 minutes before it can
be connected to the grid, and the data will be synchronized to the
Zendure App within 20 minutes.
Before setting the output to Microinverter, please confirm the rated
power of your Microinverter, the output to Microinverter should not be
!
greater than the rated power of your Microinverter.
Please turn off the device (press and hold IOT Button for 6s to shut off
SolarFlow. If battery is SuperBase V and still working , then also hold its
Power Button for 3s to switch it off .) for removing or installing battery .
EN
5