PARTS
1.
Cooling compartment
2.
Temperature control knob
3.
Shelves
4.
Vegetable container
5.
Levelling feet
6.
Door shelves
7.
Door bottle shelf
INSTALLATION
·
Remove the exterior and interior packing, wipe the outside thoroughly with a soft dry cloth and the
inside with a wet, lukewarm cloth. Dry the appliance off well.
·
Let air circulate freely around the cabinet. Allow 10 cm of space between the back, the top side and
both sides of the refrigerator and any adjacent wall.
·
Make sure there is sufficient space to open the door.
·
This cooling unit is not intended for use as a built-in appliance.
·
Select a place with a strong, level floor.
·
Avoid direct sunlight and heat. Direct sunlight may affect the acrylic coating. Heat sources nearby will
cause higher electricity consumption.
·
Avoid very moist places. Too much moisture in the air will cause frost to from very quickly on the
evaporator, and your refrigerator.
·
Before connecting your refrigerator to the power supply, check that the voltage stated on the rating
label of your appliance corresponds to the voltage in your home. A different voltage could damage the
appliance.
·
After installation, leave the freezer for 24 hours before turning it on. This way the refrigerant can
settle.
·
Allow the appliance to run empty for 8 hours so the compartment can cool to the appropriate
temperature.
·
One can level the appliance using adjustable legs. The adjustable legs can be adjusting by screwing
them in or out of the appliance.
www.domo-elektro.be
1
2
3
4
5
6
7
6
33
DO91910