Installation Guidelines  
Indoors 
Check local codes for installation requirements. Pipelines should be 
thoroughly flushed to remove foreign material before installing the 
unit. A strainer should be installed ahead of the backflow preventer 
to prevent the disc from unnecessary fouling, whether in horizontal 
or vertical position. (See Figure 1.) Install the valve inline with the 
arrow on valve body pointing in the direction of flow. 
For indoor installations, the valve must be easily accessible to 
facilitate testing and servicing. The assembly can also be installed 
in a WattsBox insulated enclosure. (See Figure 2.) Do not install the 
assembly in a concealed location. 
CAUTION
Do not install a strainer when the backflow preventer is intended 
for seldom­used water lines that are activated during emergencies, 
such as fire sprinkler lines. 
Series 007 and LF007 must be tested periodically in compliance 
with local codes, but at least once a year or more often depending 
upon system conditions. Regular inspection, testing, and cleaning 
assure maximum life and proper product function. 
NOTICE
Fire Protection System Installations. The National Fire Protection 
Agency (NFPA) Guidelines require a confirming flow test to be con-
ducted whenever a "main line" valve such as a backflow assembly or 
the shutoff valves have been operated. Certified testers of backflow 
assemblies must conduct this test. The trim valves of the detector 
meter bypass line, on assemblies so equipped, should be shutoff 
during the confirming flow test. When the test is completed, the trim 
valves must be returned to a fully open position. 
Meter Box Installation 
Parallel 
Two or more Series 007 and LF007 smaller size valves may be 
piped in parallel (where approved) to serve a larger supply pipe 
main. (See Figure 3.) This type of installation is employed whenever 
it is vital to maintain a continuous supply of water or where interrup-
tions for testing and servicing would be unacceptable. The instal-
lation increases capacity where needed beyond that provided by a 
single valve and permits testing or servicing of an individual valve 
without shutting down the complete line. 
For two valve installations the total capacity of the devices should 
equal or exceed that required by the system. 
The quantity of valves used in parallel should be determined by 
the judgment of the compliance engineer, based on the operating 
conditions of a specific installation. 
Figure 1
Strainer
Figure 2
WattsBox Insulated 
Enclosure, available in  
aluminum or fiberglass
Figure 3 
First 
Shutoff Valve 
First Shutoff Valve 
007QT-S / LF007QT-S 
First 
Shutoff Valve
007QT-S / LF007QT-S
First Shutoff 
Valve
Strainer
007QT-S/LF007QT-S 
Vertical flow-up installation

Publicité

loading

Ce manuel est également adapté pour:

Lf007 serie007 serie