All manuals and user guides at all-guides.com
3. ADTS5xxF
6
Figure 3-1: ADTS542F Front Panel (See Figure 4-1 for other variants)
3.1 Power-Up Test (see Figure 3.1)
1.
Fit "Pitot" (Pt) (1) and "Static" (Ps) (2) port blanks.
2.
Ensure that the test set is connected to an external power supply and the supply is
switched on.
3.
Use the On/Standby Switch (3) on the front of the test set to switch the test set on.
The test set performs a self test, resulting in a test set status indication (4a) "Pass" or
"Fault".
© 2014 General Electric Company – All rights reserved.
1
3
Power-Up Test (see Figure 3.1)
2
5
8
ADTS Safety and Installation Guide-English | 11
4
7