Télécharger Imprimer la page

aquabrass otto 53026 Guide D'installation page 4

Publicité

3
MOUNTING THE HOT AND COLD VALVES
A. Each faucet is supplied with a hot
and cold valve. Make sure you mount
hot (15) on the LH and cold (19) on the
RH when facing the bidet.
B. Take the hot valve (15) and mount
the first hexagonal nut (18) halfway
down valve body with flat surface up.
Take the rubber washer (16) and secure
on valve with rim side up. Push
through the under side of the bidet and
secure with fiber washer (17) and then
hexagonal nut (18). Do not tighten
until you have set the proper valve
height. Use the cardboard template
provided. This will give you the exact
measurement necessary to mount trim.
You may have to adjust bottom nut and
washer (16) (18) up or down. Now you
can secure valve tightly in place from
the top of the bidet.
C. Do the same on cold valve (19)
Make sure your valve outlets are direct-
ed towards the vacuum breaker
4
THE VACUUM BREAKER-DIVERTER
A. First, you need to prepare the
black plastic diverter (14). Install the
"L" elbow into the side outlet of the
diverter with the arrow pointing out.
This is a tapered fitting and you need
to seal firmly in place pointing down.
You will feed your bidet spray with this
outlet.
B. Next, take the "Y" connection
and thread it onto the nipple end at
the bottom of the diverter. Make sure
the black washer is inside to seal.
Tighten firmly. The hot and cold
valves will feed the "Y" inlets.
C. Now you are ready to mount the
diverter (14). Slide one of the coned
shaped washers (16) over the body
(cone shape up). From underneath
the bidet, slide the body through the
appropriate hole and secure firmly
from the top with the second coned
shape washer (16) (cone down), fric-
tion washer (17) and tie down nut
(15). Tighten firmly.
D. Finally, thread the finished trim
collar (13) on the body of the diverter
(14). Mount the handle (12) on the
broach and tie down with the screw
and cap.
Products info.: www.aquabrass.com
last revision: 05/23/2013
18
19
17
16
18
COLD
1
HOT
TEMPLATE
48
1 7/8"
12
13
15
16
17
14
L
Y
Bidet faucet 4 holes
5
CONNECTING THE FLEXIBLE HOSES
A. Check the flexible hoses for washers. Install if necessary.
B. Connect the flexible hoses (15) to the outlet of the T on the
hot/cold valves(1/2") and to the Y of the vacuum breaker (3/8").
Install the hoses carefully without twisting.
C. Connect the flexible hose (15) to the L of the vacuum breaker
(14) and to the vertical spray (21).
14
T
15
Y
6
POP UP GUIDE INSTALLATION
A. Insert the guide flange (6) and the
threaded tube (2) through the designat-
ed bidet hole.
B. From underneath, secure it in
place with rubber washer (8), metal
washer (9) and tighten firmly with
hexagonal nut (10).
C. Slide the pop up rod (1) in the hole
of the guide flange (6).
7
INSTALLING THE POP UP ROD TO DRAIN
A. Slide drain clip (5) on the horizontal rod (48) and connect in
place with popup rod (1). Adjust as necessary to open and close
drain.
NB. The drain can also be adjusted with the screw in the center part
of the body (52).
5
48
INS-SCB1-3-E
otto 53026
4 hole bidet set
robinet de bidet à 4 trous
14
L
Y
15
1
52
Updated 21-09-04
aquabrass.com
21
1
6
2
8
9
10

Publicité

loading