Télécharger Imprimer la page

GRE BAMBU2 Notice De Montage page 53

Publicité

A
DIRECTLY ON THE GROUND
C
C
We recommend you to assemble the pool between two or three persons and on a wind-free day. The use of gloves for the
installation is recommended for safety. THE ENTIRE PROCESS SHOULD BE CARRIED OUT ON FIRM AND LEVEL
GROUND, BEFORE EXCAVATING THE FOUNDATION
EXCAVATION OF THE FOUNDATION (Z) FOR THE COLUMNS (C):
Dimension of the foundation: Z= 426cm
IMPORTANT: When excavating the foundation, the rectangular space reserved for situating the AP that should be buried
5 cm and transversally fixed with their respective PG should be excavated(*). All the structural system should be perfectly
levelled (columns and internal structure, beams).
(*)
Z
426cm
426cm
Z
Foundation
C
Columns
53
KPBOC535
Z
15cm
20cm

Publicité

loading

Ce manuel est également adapté pour:

Macadamia2Kpboc5352Kpboc6322