Power
Terminal Block Installation
NOTE: Ensure all power is off/disconnected before beginning!
1 Loosen appropriate screws. Insert bare power-supply wires into appropriate terminals (positive wire into
positive [V1+] terminal, negative wire into negative [V1-] terminal, ground wire to ground [GND] terminal).
2 Tighten appropriate screws to secure wires. Repeat these steps for
a second power supply if desired (V2+, V2-, GND).
3 Install block into the device.
Front panel
LEDs
P1/P2
1000M
DIP Switch — LFPT/100M
Switch
LFPT
100M
LED
Color
Status
On
Green
Off
On
FX
Green
Off
Flashing
On
Yellow
Off
On
L/A
Green
Off
Flashing
Position
Link Fault Pass Through enabled: Devices on
a link must acknowledge that they are online
ON
before data can be transmitted. When one of the
devices doesn't respond, data cannot be sent.
OFF
Link Fault Pass Through disabled
Copper interface management — restricts
ON
data transfer rate to 100Mbps
OFF
No data transfer rate restriction
Description
Power channel is powered.
Power channel is not powered.
Fiber port is connected.
Fiber port is not connected.
Sending or receiving data.
1000 Mbps speed
10/100 Mbps speed
Valid port connection.
Connection not established.
Sending or receiving data.
Description
Instructions
English
3