Télécharger Imprimer la page

Broan EZ Fit EZ80C Guide D'installation page 7

Publicité

Les langues disponibles

Les langues disponibles

Page 7
Installation in New Construction
Remove from Packaging (See Page 3)
1
Prepare the Housing (See Page 3)
2
3
Install Fan Housing & Connect Ductwork
Push 4" duct
1
connector
into opening
and fasten
to housing
with tab
and screw
provided.
In new construction
2
(before ceiling is finished):
Attach housing to 2" x 6" or greater ceiling joists.
Use additional blocking as needed.
JOISTS
I-JOISTS
ADDITIONAL BLOCKING
4
See "Connect Electrical Wiring" on Page 6.
5
See "Replace Blower" on Page 6.
6
See "Install Grille" on Page 6.
TRUSSES
Position fan against ceiling framing with bottom edge of
3
housing flush with finished ceiling.
Use 4 screws to attach housing to framing.
Optional for additional support: After ceiling is finished,
rotate the tightening clamps as described in Step 5.
Use duct tape to connect 4" ductwork to 4" duct connector.
4
For 3" ductwork, use the 4" to 3" reducer (provided). See
below.
Tape
3" Ducting
EZ80C
Installation Guide
Tape
4" Duct
Connector
4" to 3"
Reducer
(provided)

Publicité

loading

Produits Connexes pour Broan EZ Fit EZ80C