Télécharger Imprimer la page

Pur Line VENTY TO 55 Manuel D'utilisation page 11

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 15
PARTS
INSTALLATION
1.
Fije las dos bases entre sí. (Fig.1)
2.
Place the base on the bottom of the tower fan. Please make sure the
alignment with the base and the position of the power cable hole.
Then fix the base and tower fan with 4 screws (Fig.2).
EN
Fig.1
1.
Control panel
2.
Air outlet
3.
Body
4.
Front base
5.
Base-rear
9
Fig.2

Publicité

loading