Télécharger Imprimer la page

LED2WORK TUBELED 40 II Integrated Manuel D'utilisation page 11

Masquer les pouces Voir aussi pour TUBELED 40 II Integrated:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

BA TUBELED_40 II Integrated
5 | Connection
Power supply: double insulation between primary and secondary is required. Suitable connection material, cables and
accessories can be found in the accessory range of LED2WORK.
The LED light can be controlled using 3 different operating modes, which can be selected as desired. Only an electrician
may install the light because the wire cross sections of the connecting cables must fit in the prescribed standard for your
country. The luminaire is electrically prepared for all 3 following modes.
PIN assignment of the M12 connector is as follows:
Mode 1
PIN 1
= 24V DC
PIN 2
= not used
PIN 3
= GND
PIN 4
= not used
PIN 5
= not used
The light can only be switched ON and OFF by switching the supply voltage at PIN 1.
Mode 2
PIN 1
= not used
PIN 2
= not used
PIN 3
= GND
PIN 4
= 24V DC
PIN 5
= not used
The light can only be switched ON and OFF by switching the supply voltage at PIN 4.
Schematic drawing of M12 plug
Possible variants of the M12 connector
Power supply: double insulation between primary and secondary coilis required.
PIN 1
Light
PIN 4
Light
Voltage at PIN
Action light
Voltage at PIN
Action light
www.led2work.com | shop.led2work.com
| 11

Publicité

loading