Additionally Required Materials / Zusätzlich erforderliche Materialien / Matériaux
supplémentaires requis / Materiales adicionales necesarios / Materiais Adicionais
Necessários / Extra benodigde materialmen / Materiali aggiuntivi necessary / Materiały
wymagane dodatkowo / Další požadované materiály / Ytterligare materialkrav /
Materiale suplimentare necesare / Други необходими материали / Yderligere
nødvendige materialer / Πρόσθετα απαιτούμενα υλικά / Täiendavad vajalikud materjalid
/ Muut vaaditut materiaalit / Potrebni dodatni materijali / További szükséges anyagok
/ Papildomos reikalingos medžiagos / Papildus vajadzīgie materiāli / Dodatočne
požadované materiály / Dodatno zahtevani materiali / Ayrıca Gerekli Malzemeler /
Materiais Adicionais Necessários
No.
Required Material
1
Grounding cable
2
Protective pipe
Mechanical Installation / Mechanische Installation / Installation mécanique /
Instalación mecánica / Instalação mecânica / Mechanische installatie / Installazione
meccanica / Instalacja mechaniczna / Mechanická instalace / Mekanisk installation
/Instalare mecanică / Механичен монтаж / Mekanisk installation / Μηχανική
εγκατάσταση / Mehaaniline paigaldus / Mekaaninen asennus / Mehanička ugradnja /
Mechanikai telepítés / Mechaninis montavimas / Mehāniskā uzstādīšana / Mechanická
inštalácia /Mehanska namestitev / Mekanik Kurulum / Instalação Mecânica
*Note:
1. Up to 9 battery modules can be installed in a tower. If the battery module users
purchased excesses 10 sets (including 10), a Series Box needs to be installed to connect
two towers in series.
2. The bearing capacity of the ground which is used to install the whole battery system
must be over 500 kg/m2.
Installation steps without Series Box / Installationsschritte ohne Series Box / Étapes
d'installation sans Series Box / Pasos de instalación sin Series Box / Passos de instalação
sem Series Box / Installatiestappen zonder Series Box / Procedura di installazione
senza Series Box / Czynności instalacyjne bez skrzynki Series Box / Instalační kroky
bez Series Box / Installationssteg utan Series Box / Pași de instalare fără Series Box /
Стъпки за инсталиране без Series Box / Installationstrin uden Series Box / Βήματα
εγκατάστασης χωρίς Series Box / Paigaldamisetapid ilma Series Boxita / Asennusvaiheet
ilman Series Boxia / Koraci instalacije bez Series Box / Telepítési lépések Series Box
nélkül / Montavimo veiksmai be „Series Box" / Uzstādīšanas soļi bez Series Box / Postup
inštalácie bez zariadenia Series Box / Postopki namestitve brez Series Box / Seri Bağlantı
Kutusu olmadan Kurulum Adımları / Etapas de instalação sem caixa de série
Take the installation procedure for four battery modules as an example.
78
Type
/
Corrugated pipe
Conductor Cross-section/
diameter
6-10 mm²
Inner diameter: Over 45 mm