Télécharger Imprimer la page

Tripp-Lite BP240V10RT3UTAA Mode D'emploi page 2

Publicité

Installation
(continued)
4
With the aid of an assistant (if necessary), lift your equipment and
slide it into the shelves. Attach the equipment mounting brackets to
the forward mounting rails with user-supplied screws and washers
Tighten all screws securely.
Threaded-Hole Rack Installation
1
Align the mounting rail
along the inside surface of the rack posts
A
so that the flanges on the ends of the rail wrap around to the front
and rear surfaces of the posts and the rail holes meet the threaded
holes on the rack post.
2
Secure the shelves
to the mounting rails permanently using user-
A
supplied screws and washers
• For 2U equipment mounting, place 4 screws total at the front and 4
screws total at the back.
• For 3U equipment mounting, place 6 screws total at the front and 4
screws total at the back.
Tighten all screws before proceeding.
Warning: Do not attempt to install your equipment until you
have inserted and tightened the required screws.
3
Follow steps
and
of the Square-Hole Rack Installation
3
4
instructions (above) to securely mount your 3U equipment.
Warranty Registration
Visit www.tripplite.com/warranty today to register the warranty for your new Tripp Lite product. You'll be automatically entered into a drawing for a chance to win a
FREE Tripp Lite product!
No purchase necessary. Void where prohibited. Some restrictions apply. See website for details.
Tripp Lite has a policy of continuous improvement. Specifications are subject to change without notice.
for your rack as shown.
C
1111 W. 35th St., Chicago, IL 60609 USA
www.tripplite.com/support
.
D
D
2U
4
D
3U
4
B
B
A
1
A
C
2U
2
A
C
3U
2
2
D
D
A
B
C
C
201107071 93-3000-EN

Publicité

loading