ASSEMBLY
5. Square and Anchor the Frame
a)
Check the measure of frame both 12' at the front
and back corners, as well as the center.
b)
Take a diagonal measure as shown in
H.
When these two measures are equal the frame
is square. Adjust the frame until they are equal to
within 1".
c)
Once equal check the width measures again to
ensure all are equal at 12'.
d)
Next, install Anchors (Part #23, #24 & #25) at the
4 Corner bent legs by screwing the removable
anchor (#23) into the ground and to the inside of
the shelter. Secure with cable (#24) and cable
clamp (#25) as shown in Diagram I
e)
Install Anchors (Part #23, #24 & #25) at the two
Sides Center legs tube by screwing the
removable anchor (#23) into the ground and to
the inside of the shelter. Secure with cable (#24)
and cable clamp (#25) as shown in Diagram I.
Step 2: Tarp Assembly
1. Installing the Front and Back Covers.
The front cover contains a zippered door to allow entry and
exit to the shelter. Ensure to locate this cover to the desired
end. Also ensure the zipper is in the 'closed' position while
installing.
Repeat it to get the other 1 Front Covers
a. Begin with the front cover and first locate the webbed belt that runs
the perimeter of the cover. The webbing is exposed at the peak,
the shoulders and the feet of the cover. At the feet of the cover,
the webbing has two loose ends. Tie off the two loose ends of
the webbed belt, one to each of the two corner legs.
b. Next, disconnect the 5 Cross Rails ends which connected with
End Rib.
c. Wrap the Door cover edge around the End Rib. See Diagram J.
Page 7
Diagram H
Diagram
Diagram I
12
5
Diagram J
23
23