Télécharger Imprimer la page

Zephyr Verona Island ZVN-E42AG Guide D'utilisation, D'entretien Et D'installation page 8

Masquer les pouces Voir aussi pour Verona Island ZVN-E42AG:

Publicité

Les langues disponibles

Les langues disponibles

D
n .
m i
E
n .
m i
x . F
m a
Standard
Hood Heights
Duct Cover
minimum ducted (A) 28
"
1/2
minimum recirculating (B) 32"
maximum (C) 50"
Ceiling Heights
minimum ducted (D) 90
" (7' 6
1/2
minimum recirculating (E)
94" (7'10")
maximum (F)
120" (10')
DUCTING
A minimum of 8" round duct is recommended to
Always use rigid type metal ducts only. Flexible
ALWAYS, when possible, reduce the number of
transitions and turns. If a long duct run is required,
increase duct size from 8" to 10".
If turns or transitions are required: Install as far
away from duct opening and as far apart between
the two transitions as possible.
A
n .
Minimum mount height between range top to hood
m i
B
n .
m i
bottom should be no less than 26".
x . C
m a
Maximum mount height should be no higher than
34".
i n .
" m
a x .
2 6
" m
3 4
It is important to install the hood at the proper
mounting height. Hoods mounted too low could
mounted too high will be hard to reach and will
"
If available, also refer to range manufacturer's
3 6
height clearance requirements and recommended
Extension
up to 12 feet. Turn to page 23 for part number and
Duct
Cover
ordering information.
45"
49"
80
"
1/2
DAMAGE-SHIPMENT / INSTALLATION:
") 107" (8' 11")
1/2
111" (9' 3")
• Please fully inspect unit for damage before
150
" (12' 6
")
1/2
1/2
installation.
• If the unit is damaged in shipment, return the
unit to the store in which it was bought for
repair or replacement.
• If the unit is damaged by the customer, repair
or replacement is the responsibility of the
customer.
be made by arrangement between customer
and installer.
6
www.zephyronline.com

Publicité

loading

Ce manuel est également adapté pour:

Verona island zvn-m90ag