Installation
10
Control Box and Valve Installation
Secure control box to
A
underside of bowl using
(2) #10 x 3/8" long screws
provided.
Attach 1/4" supply tube from the
WashBar to the 1/4" supply valve
outlet. Loosen the compression
B
nut on the valve body. Push the
1/4" supply tube firmly into the
tube connector until it is fully
seated. Tighten the compression
nut by hand.
For thermostatic mixing valve installation, secure 1/2" supply
hose to hot water supply valve inlet. Secure the other supply
hose from cold water supply to cold water supply valve inlet.
C
Secure valve to bowl using (2) #10 x 3/8" long screws.
For tempered line installation, secure 1/2" supply hose
to tempered water supply and TL valve inlet (not shown).
Secure valve to bowl using (2) #10 x 3/8" long screws.
Bradley • 215-1869 Rev. E: ECO 19-11-006
Hot
Cold
Hot Supply
Cold Supply
Remove 3/8" compression nut/sleeve from the
D
hot and cold supply stop valves. Connect 3/8"
end of flexible supply hose to 3/8" compression
on supply stop valve. Ensure hot and cold supply
hoses are connected to hot and cold supply stop
valve. For TL option, only connect cold supply.
11/21/2019
LD-5010
1/4" Water Supply
Outlet with
Compression Nut
3/8"
Compression
Nut
19