4. Ground the Switch
1
2
1
Ensure the rack is properly grounded and in compliance
with ETSI ETS 300 253. Verify that there is a good electrical
connection to the grounding point on the rack (no paint or
isolating surface treatment).
2
Attach the grounding wire (#6 AWG) to the grounding point
on the switch rear panel. Then connect the other end of the
wire to rack ground.
Caution:
The earth connection must not be removed
unless all supply connections have been disconnected.
Attention:
Le raccordement à la terre ne doit pas être retiré
sauf si toutes les connexions d'alimentation ont été
débranchées.
Caution:
The device must be installed in a restricted-
access location.
Attention:
Le périphérique doit être installé dans un
emplacement à accès restreint.
5. Connect Power
1
2
1
Install one or two AC PSUs in the switch.
The switch supports up to two PSUs that must have the
same matching airflow direction as the installed fan tray.
2
Connect an external AC power source to the PSUs.
Caution:
Use a UL/IEC/EN 60950-1 certified power supply
to connect to a DC converter, and a #10 AWG (for -36 VDC to
-72 VDC PSU) wire to connect to a DC PSU.
Attention:
Utilisez une alimentation certifiée UL/IEC/EN
60950-1 pour le connecter à un convertisseur CC et un câble
AWG #10 (pour -36 VDC à -72 VDC) pour vous connecter à
une alimentation CC.
1
Use the DC wire lugs
included with the
grounding kit.
2
Connect the DC return wire.
Note:
DC terminal screws should be tightened to a torque of
6.6 in-lbs.
6. Verify Switch Operation
1
1
Verify basic switch operation by checking the system LEDs.
When operating normally, the PSU0/PSU1, Diag, and Fan
LEDs should all be on green.
7. Perform Initial System Boot
1
If the network operating system (NOS) installer is located on
a network server, first connect the RJ-45 Management
(Mgmt) port to the network using 100-ohm Category 5, 5e
or better twisted-pair cable. (Not required if the NOS
installer is located on attached storage.)
2
Boot the switch. Wait for the ONIE software to locate and
execute the NOS installer, and then wait for the installer to
load the NOS software image.
Subsequent switch boots will bypass ONIE and directly run
the NOS software.
Note:
For switches with ONIE software pre-loaded, refer to
the network operating system (NOS) installer and NOS
documentation for details on software options and set up
for ONIE.
– English 2 –
Quick Start Guide
2
3
1
3
Connect the -36 – -72 VDC
wire.