Quick Start Guide
32-Port 400G Ethernet Switch
AS9726-32DB
1
1.
32-Port 400G Ethernet Switch AS9726-32DB
2.
Rack mounting kit—2 front-post brackets, 2 rear-post brackets
and ears, 20 screws, and 2 ear-locking screws
3.
Power cord (included with AC PSUs only)
4.
Console cable—RJ-45 to DE-9
1
2
1.
System LEDs and 1PPS timing port
2.
Management Ports: 1 x 1000BASE-T RJ-45, micro-USB/RJ-45
console, USB
3.
32 x 400G QSFP-DD ports
4.
2 x 10G SFP+ ports
System LEDs/Buttons
Loc: Flashing Amber (switch locator)
Diag: Green (OK), Amber (no OS or fault)
PS1/PS2: Green (OK), Amber (fault)
Fan: Green (OK), Amber (fault)
Reset Button
FRU Replacement
PSU Replacement
1.
Remove the power cord.
2.
Press the release latch and
remove the PSU.
3.
Install replacement PSU with
matching airflow direction.
Package Contents
3
Fan Tray Replacement
1.
Pull the handle release latch.
2.
Remove fan tray from the
chassis.
3.
Install replacement fan with
matching airflow direction.
2
3
5.
DC power cable (included with DC PSUs only)
6.
Grounding wire
7.
Documentation—Quick Start Guide (this document) and Safety
and Regulatory Information
Overview
4
7
5
6
5.
Product label
6.
2 x grounding screws (maximum torque 10 kgf-cm (8.7 lb-in))
7.
2 x AC or DC PSUs
8.
6 x fan trays
QSFP-DD LEDs
400G: 1 LED Blue
200G Breakout: 1 LED White,
1-2 LEDs Green
100G Breakout: 1-4 LEDs Green
50G Breakout: 1 LED Cyan
1. F2B Airflow
Remove front-to-back (F2B)
airflow fan trays (red handles) and
PSUs (red release latches).
– 1 –
www.edge-core.com
4
5
6
8
Port LEDs
SFP+ 10G LEDs
Left: Green (link)
Right: Green (10G), Amber (1G)
RJ-45 Mgmt LEDs
Left: Green (link)
Right: Green (activity)
Airflow Reversal
2. B2F Airflow
Install back-to-front (B2F) airflow
fan trays (blue handles) and PSUs
(blue release latches).
7
7
6
E052023-CS-R02
150200002419A