10 11 12 13
+
–
0...20 mA
Fig. 7. Locations of the potentiometers P201 and P200.
7. Commissioning and maintenance
Switch on the power supply and the measuring input. It is
possible during the operation to disconnect the output line and
to connect a check instrument, e.g. for a functional test.
No maintenance is required.
8. Releasing the transducer
Release the transducer from a top-hat rail as shown in
Fig. 8.
Fig. 8
9. Instrument admission
Germanischer Lloyd
10. Dimensional drawing
Fig. 9. Housing type MBS/SP2 clipped onto a top-hat rail
(35 ×15 mm or 35×7.5 mm, acc. to EN 50 022).
P201
P200
3,7 0,5
11