6
FINAL ASSEMBLY / ASSEMBLAGE FINAL / ENSAMBLAJE FINAL
HARDWARE REQUIRED / QUINCAILLERIE REQUISE / HERRAJE REQUERIDO
BCU
ADP (x10)
PARTS REQUIRED /PIÈCES REQUISES / PIEZAS REQUERIDAS
Plastic parts / Pièces en plastique / Piezas de plástico
AJQ (x1)
BAA (x1)
BAB (x1)
WARNING
!
For safety reasons, we recommend that sand be used instead
of water to fi ll the base. If a leak develops, water could run out
unnoticed, allowing the system to fall over, resulting in serious
personal injuries or property damage. For winter months,
remove the water and lay the system down to store. Water can
freeze and expand in low temperatures, possibly cracking the
base. Check the base carefully for leaks. If a leak is found, lay
the system down on the ground and call Customer Service. Do
not use, stand up, or play on a leaking system.
TOOLS REQUIRED / OUTILS REQUIS / INSTRUMENTAL REQUERIDO
(x1)
(x1)
AKZ (x1)
!
325 lb (≈148 kg)
31
AKP (x1)
ALM (x1)
FIQ (x1)
(x1)
(x1)
FIR (x1)
AEF (x2)
(x1)