KOBE CH-03 Série Manuel D'installation Et Mode D'emploi page 63

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Duct Cover Installation
5. Use 8" round steel pipe (follow building codes
in your area) to connect the ducting transition
on the hood to the ductwork above. Use duct
tape to make all joints secure and air tight.
Refer Figure 15. Slide the duct cover onto the
hood.
6. Use 3/16" x 3/8" screws (included) to attach
duct cover to hood.
Install Accessories
7. Attach oil tunnel. Refer to Figure 16.
8. Refer to Figure 17.
the hood.
Push the baffle filter upward.
Slide forward.
place.
9. For bottom casing, repeat above steps. Refer
to page 17.
10. Install heating lamps (not included), 120 Volts
175 Watts max. each.
Final Assembly
11. Turn power ON in control panel.
lights and fan operation.
12. Make sure to leave this manual for the
homeowner.
Slide the baffle filter into
Pull downward.
Check all
Figure 15
Figure 16
Fit into
Figure 17
11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ch0330sqbCh0336sqbCh0342sqbCh0348sqb

Table des Matières