Télécharger Imprimer la page

TREVIDEA G3 Ferrari TEPOR Mode D'emploi page 17

Masquer les pouces Voir aussi pour G3 Ferrari TEPOR:

Publicité

Les langues disponibles

Les langues disponibles

- Take the product and place it on the wall in the desired location. Mark on the wall the positions
corresponding to the two back-shapes. Check that the marks are aligned at 325 mm from each other. Drill
two holes (diameter 6mm) in the wall and insert the dowels into the holes.
- Use a screwdriver to insert the screws into the anchors and tighten to lock the
pieces themselves, leaving the screws about 1 inch off the wall.
- Set the product to the wall by inserting screws inside the shapes. Once the screws
are inserted, move the unit to the right until it locks in position firmly.
CLEANING
Unplug the power cord from the electrical outlet and allow
the unit to cool down before cleaning.
- Do not immerse the unit in water. Regularly clean the ventilation slot (7) on the back of the unit and the air
outlet grille (1) to prevent the dirt from clogging the airflow.
- Do not clean the unit with a sponge or abrasive detergents.
TECHNICAL FEATURES
Power supply: AC 230V
Ceramic Heating elements, Wall-mounting, IP23 protection
Digital display, Remote control, Safety device against overheating
~
50-60Hz, power: 2000W
16

Publicité

loading

Ce manuel est également adapté pour:

G3 ferrari g60022G3 ferrari bpt-2000b 5004l-erp