3.3.1 Base plan, static load and weights
Picture 3 – Base plan
The supporting base of the UPS must be designed to carry the UPS weight and to ensure its steady
and safe support.
Its carrying capacity must be adequate to the static loads indicated in the table below.
Power (kVA)
Weight w/o batteries (kg)
Static load w/o batteries (kg/m
Weight with batteries (kg)
Static load with batteries (kg/m
22
OML46086 REV. L
Installation and start-up of KEOR HPE UPS 100÷160 kVA
Installation et démarrage de l'ASI KEOR HPE 100÷160 kVA
Installazione e avviamento KEOR HPE UPS 100÷160 kVA
100
320
)
630
2
-
)
-
2
125
160
360
380
710
750
-
-
-
-