Télécharger Imprimer la page

Fulgor Milano F1SM24 2 Serie Instructions Pour L'installation Et L'utilisation page 15

Publicité

Les langues disponibles

Les langues disponibles

Hz AC electrical supply on a separate
circuit fused in both sides of the line. A
circuit breaker or time delay fuse sized
not to exceed the circuit rating of the
appliance specified on the rating plate
located on the frame behind the door
of the oven is recommended.
The oven must be supplied with copper
or aluminum wires.
If aluminum wire is provided to
connect oven to branch circuit, UL
listed connectors for joining copper
and aluminum must be used. Follow
instructions provided with connectors.
If is recommended that you have the
electrical wiring and hook-up of your
oven performed by a qulified electrician.
After installation is complete have the
electrician show you where the main
disconnect is and which of the circuit
breakers/fuses are for the oven.
Choosing oven location
Carefully select the location where the
oven will be placed.
The oven should be located for
convenient use in the kitchen, but away
from strong drafts.
Strong drafts may be caused by open
doors or windows, or by heating and/
or air conditioning vents or fans. Make
sure that electrical power can be
provided to the location selected.
Steps for installation
Steps for installation
The following pages provided the
The following pages provided the
necessary
necessary
installation of the oven and are arranged
installation of the oven and are
as follows:
arranged as follows:
• Technical Data
Technical Data
• Installation
Installation
Required Clearances and Mounting
Required
instructions for:
Mounting instructions for:
- Under counter installation, Single
- Under counter installation, Single
Oven
Oven
- Wall installation, Single Oven
- Wall installation, Single Oven
• Electrical
Requirments,
Electrical
required if connecting to 120/208
Requirments,
Volt circuit. Electrical Connections for
required if connecting to 120/208
3-wire or 4-wire Branch Circuit.
Volt Circuit. Electrical Connections
• Final Checklist.
for 3-wire or 4-wire Branch Circuit.
Final Checklist.
15 15
15
information
for
information
for
Cutout
Cutout
Dimensions,
Dimensions,
Clearances
supply
and
programming
supply
and
Programming
proper
proper
GB
GB
and
Wiring
not
Wiring

Publicité

loading

Ce manuel est également adapté pour:

F1sm24s2