Regeneration symbol
fig. 18
All the cycle phases can be gone through by repeating the operations described.
If you simultaneously press the
the operation phase, regardless of where it is.
Here the screen will display the time.
START-UP
After completing the installation, please follow this procedure carefully:
1.
Keep the water inlet and outlet taps closed (fig. 3, B, D ), connect the plug to the mains
power supply.
2.
Wait for the screen to display the time; the valve will start operating.
3.
Press the
4.
Wait for the valve to move to phase C1.
5.
Disconnect from the power supply.
6.
Very slowly, open the water inlet tap halfway (fig. 3, D) and leave it in this position for
approximately 5 minutes. When all the air has exited the drain, open the inlet tap completely and
let the water run from the drain until it is clean;
7.
Pour water in the brine container until the pipe is covered (fig. 1);
8.
Reconnect to the power supply
9.
Press simultaneously
you reach C8.
10. Wait for the valve to complete the cycle (a few minutes) and reach the operation phase.
11. Press the
Wait a few seconds until the valve moves to phase C1.
12. Press
and
the brine is sucked through the transparent glass. All the water must be sucked up.
13. Press simultaneously
14. Let it complete the cycle (it will take around 10 minutes).
15. Open completely the inlet and outlet taps (fig. 3, B, D) and close the by-pass tap (fig. 3, C).
16. Fill the brine with salt up to little over halfway.
17. Press
so that the blinking regeneration symbol lights up, programming a regeneration
at the preset time for the regeneration.
REGULATION OF THE MIXER SCREW
The water softener supplies hardness-free water; however, in some cases, it is possible that the
water still contains high mineral content.
18
EN
and
button for five seconds to start a manual regeneration cycle.
and
to move through the successive phases of the cycle until
button for five seconds to start a manual regeneration cycle.
to move to phase C2 "salt injection", wait and make sure the water from
and
Phase indicator
buttons for 5 seconds, the valve will immediately start
to move to phase C5.