Zoeller 915 Instructions D'installation page 4

Publicité

Les langues disponibles

Les langues disponibles

STEP 2
NOTE: External plumbing configuration will vary
depending on the location of basin, location of
main stack and available space.
Place the basin assembly in its final
position and complete plumbing. Secure all
connections shown in Figure 1.
Attach check valve to the discharge pipe
above cover.
1
2
3
4
5
LARGER TO ACCOMODATE OLD FLOAT DESIGN.
SK2877
FINAL ASSEMBLY
ILLUSTRATED PARTS BREAKDOWN
6
7
10
8
9
ALARM HOLE MAY NEED TO BE DRILLED
© Copyright 2018 Zoeller
Figure 1
ITEM
DESCRIPTION
1
HARDWARE KIT - STD/10' (3 M) STACK
CHECK VALVE - SHIPPED LOOSE FOR FIELD
2
INSTALLATION
3
801 PUMP
4
PIGGYBACK FLOAT
5
PIPE ASSEMBLY
BASIN COVER AND HARDWARE KIT - STD
6
BASIN COVER AND HARDWARE KIT -
10' (3 M) STACK
BASIN COVER - STD
7
BASIN COVER - 10' (3 M) STACK
8
ALARM
BRACKET - 24" (61 CM) DEEP BASIN
9
BRACKET - 30" (76 CM) DEEP BASIN
10
10' (3 M) CORD SEAL ASM
Co. All rights reserved.
®
4
SYSTEM MUST BE ORIENTED
WITH DIRECTION LABEL
RELATIVE TO THE INLET.
SK2896
MODEL :
915 - A
915 - B
8/11
12/11
QTY
thru
thru
11/11
Current
1
151846
151939
1
30-0237
30-0239
1
151692
151692
1
151847
151847
1
151848
151940
151849
151941
1
N/A
151951
17-0804
17-0828
1
N/A
17-0830
1
10-4012
10-4012
151760
151760
1
150849
150849
1
151891
151891