Télécharger Imprimer la page

Kohler Sterling 4700 Serie Guide D'installation Et D'entretien page 7

Publicité

Les langues disponibles

Les langues disponibles

Position the Wall Jamb
Wall Jamb
3. Mark the Wall Jamb Locations
Position a wall jamb against the wall directly over the bottom track. The wall jamb should sit flat
against the wall.
Slide the wall jamb down over the bottom track until the wall jamb and bottom track are fully
engaged.
IMPORTANT! The wall jamb must sit flat on the bottom ledge. If your ledge has a curve in the corners at
the side wall, it may be necessary to shape the bottom end of the wall jamb with a file.
Level the wall jamb vertically.
Using the pre-drilled screw holes as a guide, mark the hole locations on the wall.
Repeat this procedure with the second wall jamb.
Remove the bottom track and wall jambs.
NOTE: When installing on ceramic tile, use a center punch to nick the surface of the glaze. Tap the center
punch lightly with a hammer to avoid cracking the tile.
Lightly center punch the hole locations.
Drill a 5/16" hole at each mark. Use a tile or masonry bit for ceramic tile.
Press and hold the legs of each anchor (provided) together and insert the anchor legs into the
pre-drilled mounting holes.
Repeat for all the anchors.
Thoroughly clean the shower floor, ledge, and wall.
Sterling
All manuals and user guides at all-guides.com
Round off bottom
ends of wall jamb
if necessary.
Bottom Track (Inside)
Mark the Hole Locations
Wall Jamb
Pencil
7
Anchor
Press and hold
legs together.
Inside of Shower
1053310-2-D

Publicité

loading