Télécharger Imprimer la page

Calorex Pro-Pac 30M Manuel D'installation page 27

Publicité

Les langues disponibles

Les langues disponibles

6.0 REGULAR PLANNED MAINTENANCE
Operations to be carried out during a regular planned maintenance visit are as
follows:
1.
Replace all belts where fitted.
2.
Clean or replace filters as applicable. (This action may be required more
frequently than regular servicing.
3.
Check operation and condition of all fans and compressors.
4.
Check capacitor tolerances (where fitted).
5.
Check condition of all heat exchangers/evaporators.
6.
Check refrigeration system parameters.
7.
Check operation of control valves.
8.
Check for water leaks.
9.
Check drip trays and internal drain lines for blockages and clear.
10. Check operation of controls and calibrate as necessary.
11. Check operation of interlocks in use.
12. Final check on overall operation of unit.
13. Indicate on report any faults found or causes for concern.
Frequencies recommended:
Light to medium use
2 visits per year.
Heavy use
4 visits per year.
SD566252 ISSUE 51
All manuals and user guides at all-guides.com
27

Publicité

loading

Ce manuel est également adapté pour:

Pro-pac 45mPro-pac 70mPro-pac 90mPro-pac 140mPro-pac 30myPro-pac 45my ... Afficher tout