Télécharger Imprimer la page

Qcells Q.HOME CORE H4 Guide Rapide D'installation page 39

Publicité

Les langues disponibles

Les langues disponibles

12
Connecting the Inverter to Battery Packs
CAUTION
Connect the cables as follows:
When connecting the cable for BMS, check the protruding part of the cable
terminal.
Make sure the cable aligns with the terminal and slots in without resistance.
Turn the sealing nut to tighten the connection.
Before connecting electrical cables, make sure the AC circuit breaker, PV switch,
and battery DC switch are OFF.
Batteries can be replaced only by qualified personnel. If the battery needs to be
replaced, you must use a battery that meets the manufacturer's specifications.
Make sure to match the polarity of the cables properly when installing. Otherwise,
it may cause electric shock or the product may permanently be damaged. This
damage is not covered by the warranty.
Before batteries are connected, all other connections should be done and the
battery interrupter must be off.
Battery parallel connection should be performed only when the voltage difference
between the battery packs are within 2 V.
BAT OUT
BAT IN
BMS OUT
BMS IN
BAT OUT
BAT IN
BMS OUT
BMS IN
39

Publicité

loading

Ce manuel est également adapté pour:

Q.home core a4