10.4
Assembling LAN Connector
Sealing Nut
Push the LAN or DRM cable through the side of the ruber seal.
10.5
Closing the Covers
Before close the covers, complete the energy meter and CT installation. For details about installing
Note:
energy meter and CT, see "11 Energy Meter Wiring & Setting" on page 26.
Close the inner cover and tighten the 9 bolts.
1
Bolt: M4
■
Torque: 1.765 Nm / 18 kgf·cm / 15.6 lbf·in
■
24
Rubber Seal
Cable OD range: 4 to 6 mm
Tighten the sealing nut.
(Tightening torque range: 5 to 15 kgf·cm)