Télécharger Imprimer la page

IB RUBINETTERIE Euphoria 1 via Notice De Montage page 3

Publicité

EN
„ ! " # $ ! % & ' % „ %
Minimum dynamic pressure:_________________________________________________________0.5 bar
Maximum operational pressure:_______________________________________________________5 bar
Recommended operational pressure:________________________________________________1-5 bar
It's recommended to use a pressure reducer in case of
static pressure superior than 5 bar inside the waterpipe.
Maximum hot water temperature:______________________________________________________80°C
INSTALLATION, MAINTENANCE AND PRELIMINARY CHECKING PROCEDURE
In order to get your device work correctly and fi ne in time, must ensure compliance with the
mode of installation and maintenance described in this booklet. Relying on a qualifi ed plum-
ber. Make sure that the system is free from all debris and impurities existing.
INSTALLATION
Fig.1 + Fig.3: place the body in the cavity provided into the wall, taking care to refer to the
MIN and MAX installation markings printed on the label.
N.B.: the MIN and MAX markings refer to the fi nished wall, complete with cover.
Fig. 2: extract the plastic plugs and connect to the water system pipes (hot and cold water
inlet) and the outlets. Hemp should be used to ensure watertight seal on the threads.
After connecting the body to the system, turn on the stopcocks and check that the mixer tap
unit operates correctly. Keep the tap pressurised for a few minutes checking eventual leaks.
Fig. 4: measure the cavity for installation of the tap body unit so that it will be covered by
the fi nishing plate. To simplify any maintenance work, take care not to cover the check val-
ves, the thermostatic cartridge, the main screws and the water system connections.
WARNING: Once the wall is fi nished, check compliance with the min and max markings on
the label.
Fig. 5: undo the screws, remove the protective carters and the temperature stop.
Fig. 6: screw on the cover rings and fi t the temperature stop. temperature calibration settin-
gs are provided at the end of the manual.
Fig. 7: glue the gasket on the back of the plate and fi x it to the wall, sliding it over the cover
rings.
Fig. 8: fi t the handles, fi xing them with the screws.
Fig. 9: fi t the handles, fi xing them with the grubscrew. The illustration shows only one hand-
le model. However, all the models are fi tted in the same way.
CLEANING
In order to get a correct cleaning, exclusiveny wash with soap and water, rewash and dry
with deerskin and a soft cloth. Avoid to use alcohol, solvents, solid or liquid detergents made
by corrosive or acid substances, towel made by synthetic materials, abrasive sponges,
because they could irreversibly alterate the treated surfaces.

Publicité

loading