TYPICAL INSTALLATION
For outdoor installation, use our NEMA 3R enclosure
(DCC-9-BOX-3R).
by
Meter Stack
Main Breaker
ELECTRICAL INFRASTRUCTURES
Panel
Electrical
Meter
DCC-9
by
Main
Disconnect
ELECTRICAL INFRASTRUCTURES
Electrical
Sub Panel
Meter
Main Panel
ELECTRICAL INFRASTRUCTURES
NOTES
DCC-9 with
Meter Stack
METER STACK
Panel of the Unit
DCC-9
EV Charger
DCC-9 with
MAIN DISCONNECT
MAIN DISCONNECT
CHARGING
INFRASTRUCTURES
EV Charger
DCC-9 with
CHARGING
SUB PANEL
INFRASTRUCTURES
DCC-9
EV Charger
by
CHARGING
INFRASTRUCTURES
DCC INSTALLATION
STEP 1: CHECK THE PACKAGE CONTENTS
DCC-9 with
1 x DCC-9-BOX
or 1 x DCC-9-BOX-3R
visit our website www.rve-usa.com/products/dcc-box/
STEP 2: PREPARATIONS FOR INSTALLATION
DCC-9 with
1. Disconnect the main power
2. Select the DCC intended location.
The DCC can be mounted:
- on a ceiling
- on a wall
NOTE: The DCC controller must be mounted so that the nameplate
DCC-9 with
remains visible at all times.
SUB PANEL
Do not install the DCC:
- Outdoor, unless the DCC is ordered with our NEMA 3R enclosure.
- In a location with high level of risk.
- Nearby inflammable materials, explosives or fuels, chemical
products and vapors.
DCC-9-BOX & DCC-9-BOX-3R
1 x Ceiling
mounting support
INSTALLATION VIDEO
To access our installation video,
8
1 x Installation
manual