Do not install the DCC stack:
- Outdoor
- In a location where it would be at risk of being damaged
- Nearby inflammable materials, explosives or fuels, chemical
products and vapors.
3. Before installation, check the DCC stack mounting position.
Warranty automatically void if the DCC is installed incorrectly.
STEP 3: INSTALLATION
1. Remove the cover screws (4 per cover) and remove each of the front
covers;
2. Position the DCC stack at the intended location;
3. Fix the DCC stack with the anchors suitable for the type of surface;
4. Check that the DCC stack is adequately fixed to the floor.
STEP 4: DUCT INSTALLATION
The ducts can be installed according to the layout chosen by the installer:
- On the back of the stack, for each DCC box, to the corresponding meter
socket if the DCCs and the meters are back-to-back:
DCC-9-BOX6
WARNING
SIDE VIEW
Meter Stack
- On the sides, from the upper and lower junction boxes of the DCC stack:
- Downwards and/or upwards from the upper and lower junction boxes
of the DCC stack:
STEP 5: CONDUCTOR CONNEXIONS
See label within the box.
STEP 6: SECURE AND RE-ENERGIZE
1. Secure : Put the cover back on each DCC;
2. Re-energize : Supply electrical power to the DCC.
STEP 7: IDENTIFICATION
1. Register all the information of the charging station owner (address
and parking space) in the space provided on the cover of each DCC;
2. Register all configuration settings of the main power supply (essential
load) in the space provided on the cover.
MAINTENANCE
Do not use any cleaning solvents to clean the DCC.
13
DCC-9-BOX3 & DCC-9-BOX6