TYPICAL INSTALLATION
DCC-9-BOX6
by
by
by
by
by
by
ELECTRICAL
INFRASTRUCTURES
Panel of the Unit
UPPER LEVEL
EV Charger
CHARGING
INFRASTRUCTURES
DCC INSTALLATION
STEP 1: CHECK THE PACKAGE CONTENTS
1 x DCC-9-BOX3
or 1 x DCC-9-BOX6
INSTALLATION VIDEO
To access our installation video,
visit our website www.rve-usa.com/products/dcc-box/
STEP 2: PREPARATIONS FOR INSTALLATION
1. Disconnect the main power;
2. Select the DCC stack intended location;
It can be mounted:
- On the back of a meter stack
- At any other location deemed adequate by the installer.
NOTE: The DCC stack must be mounted so that the nameplate
remains visible at all times.
12
DCC-9-BOX3 & DCC-9-BOX6
1 x Installation
manual