4.2
collector box installation
note:
With the appliance in place,
it is best to install appliance
venting before adding the vent
shield and collector boxes.
Secure collector boxes to the
appliance using screws provided.
note:
The collector boxes MUST
completely cover the
knockout/cover plate openings.
IMPORTANT:
It is recommended to install ALL vent heat shield(s) before refi tting the front (and, where
applicable, rear) frame for ease of access. It is critical that ALL 4 knockout plates, ALL 4
cover plates are removed and BOTH (2) collector boxes are installed.
4.2.1 ducting installation to collector box
WARNING
!
•
Before framing your appliance
or deciding on fi nal location,
determine vent requirements.
Also, see appliance manual for
vent shield installation, nailing
tabs installation, electrical
installation, gas installation, etc.
1. Attach the ducting to the
collector boxes plate using the
screws provided.
2. Reinstall front frame (and rear
frame for see-thru).
appliance pre-installation
Screw locations
vary by model size
x 6 per collector box
Type 1
Appliance illustrated
for clarity purposes.
W415-3001 / A / 04.30.21
EN
13