3. Connect Hose
Connect the spray hose to the quick
connection with a simple push.
4. Install Counterweight
Install the quick-connect counterweight
on the pull-down hose at the marked
postition. (It should be placed on the
line, but can be moved in either
direction if necessary.)
5. Check For Leaks
Turn on the water valves and then test
the faucet. Run the water flow for
15 seconds to clean up the lines and
check for any leaks.
•
Continue to check for leaks
throughout the first hour of
installation.
•
If leaking occurs, turn off water
supply and discontinue
use immediately.
12
6. Attach Spray Head
Screw the spray head clockwise
onto the pulldown hose. (You may
need to pull the hose down.)
7. Check All Functions
After installation is complete,
turn on the faucet and do a final
check for any leaks. Turn on water
to make sure the water runs
correctly. Switch from spray
mode to stream mode a few
times to make sure the switch
opperates properly.
13