19.
Adjust height of cover support collar flush to just below the finished floor. Cover support collar is adjustable for finished
floors of 0 inches to .25 inches [0.0 - 6.4 mm] thick. Tighten mounting screws [13] to 10 - 15 lbs-in torque [1.1 - 1.7 N m].
20.
For thicker floor finishes use accessory collars (CFB6RCVRR series), sold separately.
Seal the gap around the cover support collar [12] with a continuous bead of electrical grade type RTV silicone sealant (SEE
FIGURE 6).
21.
Use the provided floor gasket or apply a 1/4 inch [6.3 mm] thick continuous bead of electrical grade type RTV silicone
sealant compound around the perimeter on the underside of the flange [12].
22.
Attach flange [14] to the cover support collar [12] using #8-32 flat head screws [15] provided with the cover. Tighten to 10 -
15 lbs-in torque [1.1 - 1.7 N m].
SEAL ALL AROUND
15
14
FIGURE
6
CFB2GS1R6ADAPTE ROUND COVER ADAPTER FOR 2 GANG RECESSED
CONCRETE FLOOR BOX
CAUTION: RISK OF ELECTRICAL SHOCK. Disconnect power before installing or servicing.
NOTICE: For installation by a qualified electrician in accordance with all national and local electrical codes, communications
standards, the following instructions and any instructions included with individual devices.
NOTICE: Insure data/communications circuits are separated from lighting/power circuits in accordance with the NEC and CE
Code requirements.
Use with CFB2G25E, CFB2G25CRE, CFB2G30E, or CFB2G30CRE floor boxes.
Use with CFBS1R6CVRxx series round covers or CFBS1R6FFCVRxx series round furniture feed covers.
Use with CFBHUB2, 2 in. metallic conduit hubs, CFBHUB125PVC, 1-1/4 in. non-metallic hubs, or CFBHUB200PVC, 2 in.
non-metallic hubs, when used with the CFB2G30E and CFB2G30CRE series boxes. May be used in place of knockout plates as
needed.
Use with CFB6RCVRR075 stackable pre pour rings to increase concrete thickness over the box. Each ring adds 3/4" of concrete
over the box.
BEFORE CONCRETE POUR, SEE FIGURES 1, 2, and 3
1.
Remove and retain four #8-32 flat head screws [1] from top four corners of the box.
2.
Remove mounting plate [2] from the box.
3.
REMOVE AND DISCARD PLASTIC [3] AND METAL [4] COVERS ATTACHED TO THE MOUNTING PLATE [2].
4.
Install leveling screws [5] as shown in FIGURE 1.
5.
Make conduit connections in accordance with application and applicable electric codes. 2" trade size conduit hubs,
(CFBHUB2) or PVC conduit hubs (CFBHUB125PVC, CFBHUB200PVC) may be used in place of knockout plates [6] (CFB4G30E,
xxCRE only) as needed.
8
CFBHUB2
Conduit Hub
2 in. trade size
(sold separately)
CFBHUB125PVC
PVC Conduit Hub
1-1/4 in. trade size
(sold separately)
Wiring Device - Kellems
Hubbell Incorporated (Delaware)
40 Waterview Dr.
Shelton, CT 06484
1-800-288-6000
www.hubbell-wiring.com
PD-3014
3/23
Installation Instructions
4
3
2
1
7
5
6
FIGURE
1
CFB2G30E shown
ENGLISH

Publicité

loading

Sommaire des Matières pour Hubbell CFB2GS1R6ADAPTE

  • Page 1 CFB2GS1R6ADAPTE ROUND COVER ADAPTER FOR 2 GANG RECESSED Adjust height of cover support collar flush to just below the finished floor. Cover support collar is adjustable for finished floors of 0 inches to .25 inches [0.0 - 6.4 mm] thick. Tighten mounting screws [13] to 10 - 15 lbs-in torque [1.1 - 1.7 N m].
  • Page 2 Wiring channel [7] can be positioned along either side of box. AFTER CONCRETE POUR, SEE FIGURES 4, 5, & 6 Reposition mounting plate [2] aligning short leg with wiring channel (SEE FIGURE 3). Install adapter [9] on top of the mounting plate assembly [2]. Secure using #8-32 screws [1] removed in step 1. Locate floor box, remove three screws [11] and remove temporary concrete cover [10].
  • Page 3 0,0 - 6,4 mm [0 0,25 po] d' paisseur. Serrer les vis de montage [13] un couple de 1,1 - 1,7 Nm [10 - 15 lbpo]. Pour les planchers plus pais, utiliser les colliers accessoires (s rie CFB6RCVRR), vendus CFB2GS1R6ADAPTE Directives de montage FRAN AIS s par ment.
  • Page 4 Positionner la canalisation de c blage [7] d'un c t ou de l'autre de la bo te. R installer la plaque de montage [2] en alignant l'ouverture APR S LA COUL E DU B TON, CONSULTER LES FIGURES 4, 5, ET 6 avec la canalisation de c blage (consulter la FIGURE C).
  • Page 5 Wiring Device - Kellems HUBBELL M XICO garantiza este producto, de estar libre de defectos en materiales y mano de obra por un a o a partir de su compra. Hubbell reparar o reemplazar el art culo Hubbell Incorporated (Delaware) a su juicio en un plazo de 60 d as.
  • Page 6 Los canales de cableado [7] se pueden posicionar a lo largo de cualquier lado de la caja. DESPU S DEL COLADO DEL HORMIG N, VER FIGURAS 4, 5 y 6 Reinstalar la placa de montaje [2] alineando la abertura con el canal de cableado (VER FIGURA 3). Vuelva a instalar la transici n [9] en la parte superior del conjunto de la placa de montaje [3].