Télécharger Imprimer la page

Jilong FISHMAN II Serie Manuel D'instructions page 8

Publicité

After the inflation adapter is assembled completely, you can inflate the boat by
number sequence. Do not over inflate. After inflating screw the valve cap A in
clockwise direction by hand.
Fill each chamber until it is stiff. Measure the printed ruler to 10cm with the
equipped hard ruler to check the main chamber for proper inflation.
Caution: Do not over inflate or use high-pressure pump. The maximum pressure
for air chamber number
Inflating
- Unscrew the valve cap A, assemble the Inflation Adapter with inflating mouth B,
air pressure meter and the air pump.
Caution: Do not over inflate, or use a high-pressure pump!
Deflating
Remove the valve cap A, push down the deflation button C and turn the valve
clockwise direction by 90° until its is locked, release the valve and the air will flow
out. If you want to stop the deflation, push down the deflation button C and turn
it in counter-clockwise direction by 90°. The deflation will stop when the valve is
released.
8
All manuals and user guides at all-guides.com
INFLATING THE BOAT
0.10bar(1.45PSI)
www.jilong.com
FBII-14-GB(V2)

Publicité

loading

Ce manuel est également adapté pour:

072110721207238