Installing The Extraction Hood - Hanseatic SY-103D3-E3-C9-600 Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Installation

Installing the extraction hood

Make sure that when drilling the holes no lines are damaged.
Caution!
Please observe your cooker's instruction manual! If a greater
Important!
clearance than 65 cm is specified, this must be taken into
consideration.
1. In order to position the appliance exactly above the cooker in the centre,
make a guide line on the wall (vertical line, with the aid of a spirit level or
plumb line, from the centre of the cooker to the ceiling).
Plumb line
Preparation
11
English

Publicité

Table des Matières
loading

Table des Matières