Télécharger Imprimer la page

Desa RCLP375 Manuel Du Propriétaire page 12

Publicité

Les langues disponibles

Les langues disponibles

SERVICE
PROCEDURE
Continued
21. Connect motor wires as
follows (see Figure 6,
page 10):
• white wire—to terminal
board. Note: Attach to
empty connector on white
wire side of terminal
board.
• red wire—to terminal
board. Note: Attach to
empty connector on black
wire side of terminal
board.
• blue wire—to thermal
switch wire
• blue wire—to solenoid
valve
• green wire—to grounding
screw on shell
22. Replace side cover.
23. Replace fan guard.
SPECIFICATIONS
12
All manuals and user guides at all-guides.com
Model
Input Rating (kJ/Hr) (BTU/Hr)
Fuel
Fuel Consumption
Gallons/Hour
Pounds/Hour
Supply Pressure To Regulator
Minimum (for purposes of
input adjustment)
Maximum
Regulator Outlet Pressure
Motor
Electric Input
Amperage
Weight
Heater
Shipping
Size - L x W x H
Heater
Carton
RCLP375 and BCLP375
168.800 to 332.325 (160,000 to 315,000)
Propane Vapor Only
6,8 l/h min./13,6 l/h max.
(1.8 Minimum/3.6 Maximum)
3,35kg/h min./ 6,85 kg/h max.
(7.4 Minimum/15.1 Maximum)
172 kPa (25 psig)
1379 kPa (200 psig )
48 - 138 kPa (7-20 psig)
1700 RPM
120 V/60 Hz
3.0
18, 1 kg (40 lbs.)
21,8 kg (48 lbs.)
89 cm x 33 cm x 51 cm (35 in. x 13 in. x 20 in.)
94 cm x 40,5 cm x 53,5 cm (37 in. x 16 in. x 21in.)
100165

Publicité

loading

Ce manuel est également adapté pour:

Bclp375