Télécharger Imprimer la page

Klarstein 10032121 Mode D'emploi page 12

Masquer les pouces Voir aussi pour 10032121:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

EN
12
All manuals and user guides at all-guides.com
Please use filter bucket to get rid off
the residue. If the residue is too small,
please use a gauze to filtrate the
residue.
Pre-fermentation
Please prepare yeast, the yeast dosage is 10% of „wort" liquid. Please prepare 250ml
„wort" and mix it with yeast in a disinfectant content and stir it. Make sure you the
„mixture" under 20-25 environment temperature to cultivate for 12-24 hours. (the more
yeast you put, the fermentation process is faster). always string the „mixture", when the
fermentation is done, put it in a big urn and mixture it will all „wort" which had been
prepared.
Main Fermentation
The main fermentation takes 5 to 7 days. The temperature should be kept at 8-12 °C.
18-24 hours later:
bubbles will be on the liquid surface.
2
-3
day:
there will be more bubbles
nd
rd
4
-6
day:
the bubbles will start to sink
th
th
After the bubble finish sinking, please taste the fermentation juice, when you feel the
taste is smooth, and with yeast taste, the (young) beer is ready!
The device has a ring which can be placed
on the boiler, to put the filter bucket on it, so
that the mash can drip off.

Publicité

loading

Ce manuel est également adapté pour:

1003334010033341