ASSEMBLY INSTRUCTIONS
Suggested Tools:
• Wrench and/or Ratchet Set
• Pliers
Remove the handle from the hopper (4 nuts and bolts).
1
Note: the gate linkage is nested between the hopper and
the frame for shipment.
Flip handle upright and reattach
2
handle to hopper using the 4 nuts
and bolts from step 1.
Assemble the gate linkage to the gate by inserting the "S-shaped" end into the gate.
3
Note: Let the linkage hang freely - Gate will not stay attached until completely assembled.
All manuals and user guides at all-guides.com
2E
Correct
Orientation