Télécharger Imprimer la page

Watts FD-190-PR Manuel D'installation page 3

Publicité

Les langues disponibles

Les langues disponibles

2. Drain Body
Attach the drain body securely to the leader pipe. Use the bubble level on top of the plastic
cap to level the drain body evenly before concrete is poured. Check local code requirements
before pressure testing the connection. Plastic drain body should be solvent welded to the
pipe. Cast iron body will be no hub or push on (specify).
3. Concrete
Concrete floor should be poured flush with the top of the drain body.
4. Waterproofing Membrane
Waterproofing membrane is used per the manufacturers instructions.
Clamping collar must be removed while installing waterproofing membrane.
Waterproofing membrane sits on top of the drain body. Clamp collar attaches to the
drain body clamping the waterproofing membrane between the two. Small grooves
in the clamp collar allow water to flow off the membrane, through the slits and into
the drain. Clamp collar is secured with screws (provided). Screws should be
inserted with a maximum torque of 8 ft-lbs.
Note: Clamp collar inverts for a lower rough-in height.
All manuals and user guides at all-guides.com
Drain Body
Concrete
Clamping Collar
Clamping Collar
Waterproo ng
Membrane
Concrete
Leader Pipe
Waterproo ng
Membrane
3

Publicité

loading

Ce manuel est également adapté pour:

Fd-190-pr-60Fd-290-prFd-290-pr-60