1
12
2. Insert the main tank
person holds the respective tank in place while you screw it onto the frame.
3. Screw the main tank and the additional tank to the frame with two M8 hexagonal screws
4. Remove the caps at the end of the lines
Make sure that the seals underneath them do not fall out and that the yellow ring (screw aid)
remains on the hose.
5. Connect connection "1" of the main tank
line
.
9
6. Connect connection "2" of the main tank
second line
.
9
Make sure that the lines run parallel and do not cross!
7. Slide a yellow ring (screw aid) over a union nut at each end of a line and screw the hoses onto all
tank connections by hand.
3
8
7
8. Insert the base
9. Slide the connecting elements
5
1
5
10. The second person holds the shower head
head onto the two tanks
18
2
1
and the additional tank
5
into the frame
.
8
7
onto the shower head
3
11
.
5
6
2
5
6
7
into the frame
6
.
9
and connection "1" of the additional tank
5
and connection "2" of the additional tank
5
4
1
6
15
14
, while you screw the pipe connections of the shower
1
1
2
and make sure that another
7
on both sides.
9
each.
12
to the first
6
to the
6
1
3
13