Télécharger Imprimer la page

Playcore Swing-N-Slide PB 9242 Instructions D'assemblage page 40

Publicité

Assembly Plan
Fig. 34a
x4
Quick Link
Wind Rider Assembly
1. Insert Seat into Handle as shown in (Fig. 34). Secure in place with hardware shown.
Note: Make certain no more than two bolt threads protrude from the Loc-Nut once fully tightened.
2. Insert (1) Quick Link into the end of each length of 51'' chain, as shown in (Fig. 34a). Make certain the Quick Link
is positioned as shown.
3. Using the Quick Link, attach each length of 51'' chain to the (4) corners of your swing as shown in (Fig. 34b).
Make certain Quick Link is positioned as shown.
4. Close and tighten all four Quick Links with a suitable wrench, as shown in (Fig. 34c).
5. Attach (2) 51'' Chains per Swing Hanger as shown in (Fig. 34d). Be certain to crimp Swing Hangers closed to
secure swing chain in place and prevent possible injury.
Fig. 34
5/16''
Loc-Nut
Fig. 34b
x4
Quick Link
Wind Rider
5/16''
Flat Washer
Flat Washer
Fig. 34c
x4
Quick Link
Wind Rider
40
6-1/2''
Hex Head Bolt
5/16''
Fig. 34d

Publicité

loading