Télécharger Imprimer la page

OVE MALLORY 60 Manuel D'installation page 9

Publicité

Les langues disponibles

Les langues disponibles

1. Ensure the base and walls are leveled. Place the metal track (B) approximately 3/4" (20mm) from the edge
of the base to the center of the metal track. Ensure the metal track (B) is leveled, then mark the holes clearly
on the wall using a pencil.
2. Remove track and drill pilot holes in the marked locations. Using ø5/16" (8mm) ceramic drill bit.
3. Insert the wall anchors (EE) using a rubber mallet until the wall anchors are flush with the wall.
4. Replace and secure the metal track (B) with screws (CC). Do not overtighten.
Note: Insert the door panel's bottom seal strip (L) at the base of door
panel (C) and cut the surplus with a cutter. Place the door panel (C)
inside the shower enclosure to facilitate future steps.
Helpful Hint
Make sure there
is a support stud
located behind the
drywall, behind the
tracks!
WALL TRACK INSTALLATION
3/4"
20mm
9
1
B
2
ø5/16"
8mm
3
EE
4
CC

Publicité

loading